Pig gestation calculator

Sows and gilts farrow about 114 days after breeding: three months, three weeks and three days. Enter the service date to get the farrowing date, the 113–117 day range and the days to heat-check and scan.

If she was served more than once, enter the last date to get a farrowing window.

Due date

Pick a date above

Earliest to latest
–
Gestation used
–

Pregnancy calendar

Pregnancy calendar: dates, days after breeding and what to expect
DateDayWhat to expect

How long are pigs pregnant?

The classic figure is 114 days [3][4][1], easy to remember as 3 months, 3 weeks and 3 days [4][5]. Normal farrowing runs from 113 to 117 days[5][2].

Pig gestation: what the sources say
SourceWhat it says
Missouri Extension [3]Average 114 days
Purdue vet school [4]114 days: 3 months, 3 weeks and 3 days
Merck Vet Manual [2]Average has been rising: now 115–116 ± 1 days from first service
NADIS (UK vets) [5]Typically 115 days; 113–117 is normal

Modern commercial sows tend to go a day or two longer. Merck notes that the average has been rising and now sits at 115–116 days from first service [2], and NADIS gives 115 as typical [5]. The calculator keeps 114 as the average, as Missouri and Purdue do, and shows the range to 117 so a later litter isn’t a surprise.

Farrowing dates for breeding on the 1st

Missouri Extension prints a table of breeding dates and farrowing dates at 114 days [3]. The calculator gives the same dates. When a February 29 falls during the pregnancy, the farrowing date is one day earlier.

Farrowing date for a sow bred on the 1st of each month (114 days, non-leap year)
Bred onDue to farrow
January 1April 25
February 1May 26
March 1June 23
April 1July 24
May 1August 23
June 1September 23
July 1October 23
August 1November 23
September 1December 24
October 1January 23
November 1February 23
December 1March 25

Heat checks, scans and getting ready

Pig pregnancy milestones used in the calendar (days after breeding)
WhenWhat
Day 18–24Watch for a return to heat. An open sow or gilt usually returns to heat 18–24 days after service. [2][6]
Day 26–30Ultrasound pregnancy check. Real-time ultrasound is generally used from about day 26–30. [2][4]
5–7 days before the due dateMove into the farrowing area. Place her in the farrowing pen or crate 5–7 days before she is due. (per NADIS) [5]

Common questions

What is the 3-3-3 rule for pigs?

Pregnancy in pigs lasts about 3 months, 3 weeks and 3 days, which adds up to roughly 114 days[4][5]. Counting exact days is more reliable than counting months, because months differ in length; the calculator does that for you.

Is gestation the same for gilts and sows?

The sources here give one figure for gilts and sows, so the calculator uses the same range for both. Merck’s rising average is measured from first service [2].

Does this work for pot-bellied pigs?

Yes. Purdue’s 114-day guidance covers both domestic and pot-bellied sows [4].

What if she hasn’t farrowed by day 117?

She is past the published normal range. Recheck the service date, and talk to your vet if she is still waiting.

These dates are planning estimates from published averages, not veterinary advice. Your vet can confirm a pregnancy.

Sources

  1. Merck Veterinary Manual, table “Approximate Gestation Periods”Gestation by species; dog 62–64 days from ovulation, 58–72 days from breeding
  2. R. V. Knox, “Breeding Management of Pigs,” Merck Veterinary Manual (reviewed 2026)Average gestation now 115–116 ± 1 days; 18–24-day return to estrus; ultrasound at 26–30 days
  3. J. C. Rea, “Care of Pigs From Farrowing to Weaning,” MU Extension G2500Sow gestation averages 114 days; breeding-to-farrowing table
  4. J. H. Koziol, “What to Expect When: Your Sow is Expecting,” Purdue University VA-30-W114 days (3 months, 3 weeks, 3 days); pregnancy check about 30 days; late-pregnancy signs
  5. M. White, “Farrowing Process,” NADIS Pig Health BulletinTypically 115 days, 113–117 normal; farrowing area 5–7 days before
  6. BPEX “Action for Productivity” no. 29, “Effective Heat Detection,” via The Pig Site (2013)Returns to heat 18–24 days after service

Last reviewed . Found a mistake? Let us know.